Analysis of Organization X Problems Through Diagram Fishbone and Implementation of Plan - Do - Check - Action

Since Novayanti Manik, Cholichul Hadi

Abstract


CyclePlan-Do-Check-Action(PDCA cycle) is part ofcontinuous improvementwhich was initiated by W. Edwards Deming. The PDCA cycle emphasizes that every management action can be improved by carefully implementing the following work sequence:plan, do, check, actionThe data collection process began with an analysis of the problems experienced by the kitchen work unit. However, three kitchen supervisors reported that the problem they were facing was confusion over menu variations. This issue was then collectively examined for its underlying causes using a 5-point analysis.Whywith the next action plan. After usingtool 5 why, tracing the root cause of the problem felt like something was missing, so that when looking at the next action plan, it still seemed inadequate. Therefore, we tried usingtoolanother isfishbone diagram. FishboneThe diagram turned out to produce various root causes, even some things that were thought to be the main problem turned out to be the root cause of the main problem. Confusion in the menu variations was caused by 5 things consisting ofmanpower, machine, method, material And environmentwhich can be seen in detail in the partsfishbonePDCA diagram is a work sequence that can be used after knowing the root cause of the problem faced by organization X. The plans that will be carried out and the results that can be seen are based on observations and results from the table.checkweekly every two months.

Keywords


Fishbone; PDCA; SDM.

Full Text:

PDF

References


Antony, J., & Gupta, S. (2019). Top ten reasons for process improvement project failures. International Journal of Quality & Reliability Management, 36(9), 1548–1562. https://doi.org/10.1108/IJQRM-09-2018-0270

Bayo-Moriones, A., & Merino-Díaz de Cerio, J. (2002). Quality management and high performance work practices: Do they coexist? International Journal of Production Economics, 76(1), 39–56. https://doi.org/10.1016/S0925-5273(01)00141-4

Deming, W. E. (1986). Out of the Crisis. Massachusetts Institute of Technology, Center for Advanced Educational Services.

Gaspersz, V. (2011). Continuous Improvement: Sebuah Pendekatan Praktis Total Quality Management. PT Gramedia Pustaka Utama.

Ishikawa, K. (1985). What Is Total Quality Control? The Japanese Way. Prentice Hall.

Liker, J. K. (2004). The Toyota Way: 14 Management Principles from the World's Greatest Manufacturer. McGraw-Hill.

Moen, R., & Norman, C. (2010). Circling Back: Clearing up Myths about the Deming Cycle and Seeing How It Keeps Evolving. The Quality Management Journal, 17(2), 32–46.

Nurillah, Umi. 2017. “Standarisasi Proses Produksi Menggunakan Metode Kaizen Di CV. Lestari Rasa”

Oakland, J. S. (2014). Total Quality Management and Operational Excellence: Text with Cases (4th ed.). Routledge.

Pheng, L. S., & Chuan, C. J. (2006). Environmental factors affecting quality management practices in construction. Total Quality Management & Business Excellence, 17(4), 407–428. https://doi.org/10.1080/14783360500451397

Ritajeng, Mega Metta, dkk. 2015. “Perancangan Model Pengukuran Kinerja Green Supply Chain Management Berdasarkan Green SCOR Dengan Pendekatan PDCA Pada Perusahaan Baja Hilir”. Jurnal Teknik Industri Untirta Vol. 3 No. 1

Sallis, E. (2014). Total Quality Management in Education (4th ed.). Routledge.

Warman, John. 2012. “Manajemen Pergudangan”. Jakarta: Pustaka Sinar Harapan.

Zakariya, Putra Rizky. 2014. “Perbaikan Mesin Digester Dan Press Untuk Menurunkan Oil Losses Di Stasiun Press Dengan Metode PDCA (Studi Kasus Di PT. XYZ )”. Jurnal PASTI Vol. VIII No. 2, 287-299




DOI: http://dx.doi.org/10.58258/bisnis.v4i4.9581

Refbacks

  • There are currently no refbacks.


Lisensi Creative Commons
Ciptaan disebarluaskan di bawah Lisensi Creative Commons Atribusi-BerbagiSerupa 4.0 Internasional.

Bussiness Management
p-ISSN: 2828-8203, e-ISSN: 2828-7606
Jurnal ini diterbitkan oleh Lembaga Penelitian dan Pendidikan (LPP) Mandala.

Alamat: Jl. Lingkar Selatan, Perum Elit kota Mataram Asri Blok O. No. 35, Jempong Baru, Sekarbela, Kota Mataram NTB. Indonesia