Impact Analysis of Eastern Sector Red Belt Road Development in Belu Regency Border Area (Policy Study in Sisi Village and Nualain Village, Lamaknen District, Belu Regency)

Authors

  • Donatus Sae SEKOLAH TINGGI ILMU SOSIAL DAN ILMU POLITIK FAJAR TIMUR ATAMBUA
  • Yoseph Franky Leto Bere SEKOLAH TINGGI ILMU SOSIAL DAN ILMU POLITIK FAJAR TIMUR ATAMBUA

DOI:

https://doi.org/10.58258/jisip.v8i1.6183

Keywords:

Impact of sabuk merah road construction

Abstract

The Eastern Sector Red Belt Road is an acceleration of infrastructure development of 3T (frontier, remote and underdeveloped) areas in the nawa cita program. The implementation of the nawa cita program in the Belu-Atambua border area is 179.99 km of state roads, 44 bridges and street lights. Approximately 5 (five) years of the construction of the Eastern Sector Red Belt Road has been completed, there are several positive opportunities for the community, especially Sisi Village and Nualain Village as users. The positive impact is one of the measures for the success of the nawa cita program for the 3T community in Sisi Village and Nualain Village, Lamaknen District, Belu Regency.

Downloads

Published

2024-01-02

How to Cite

Impact Analysis of Eastern Sector Red Belt Road Development in Belu Regency Border Area (Policy Study in Sisi Village and Nualain Village, Lamaknen District, Belu Regency). (2024). JISIP (Jurnal Ilmu Sosial Dan Pendidikan), 8(1), 306-310. https://doi.org/10.58258/jisip.v8i1.6183